• Guangzhou TP Cloud Power Construction Machinery Co., Ltd.
    Duthie
    Thanks for your support! TP's products are of high quality and the service is also very good, I will place an order again!
  • Guangzhou TP Cloud Power Construction Machinery Co., Ltd.
    Morani
    Your products are beautiful,and the package is also exquisite , my customers love them, and you ship very quickly, you do a great job!Thank you so much!
Contact Person : Kervin
Phone Number : +86 18665702391
WhatsApp : +8618665702391

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly

Place of Origin Tokyo Japan , GuangDong China
Brand Name Perkins
Certification IATF16949:2020 /ISO9001:2008
Model Number C7.1 DI
Minimum Order Quantity 1 PC
Price Negotiated Price
Packaging Details Wooden case/Carton/Standard Shipping Package
Delivery Time Delivery within one week after receiving of payment
Payment Terms L/C, T/T, X-Transfer
Supply Ability 120 PCS Per Month
Product Details
PRICE Negotiable CONDITION Brand New
CERTIFICATION IATF16949:2020 /ISO9001:2008 QUALITY Excellent
WARRANTY 18 Months DELIVERY TIME Within One Week After Receiving The Payment
PAYMENT TERMS L/C,T/T, X-Transfer PACKING METHODS Wooden Case/Carton/ Standard Shipping Package
PRODUCT NAME Engine Cylinder Head Assembly CAR MAKE Excavator
APPLICATION Diesel Engine OE No. 425-3316 450-9263 T414546
SHIPPING Air Sea Express Delivery SAMPLE Acceptbale
SAMPLE ORDER Acceptbale HIGH LIGHT Engine Cylinder Head Assembly 425-3316 450-9263 T414546 For Excavator E320D2 Perkins Engine C7.1 DI
High Light

425-3316 Engine Cylinder Block

,

450-9263 Engine Cylinder Block

,

T414546 Engine Cylinder Head Assembly

Leave a Message
Product Description

Engine Cylinder Head Assembly 425-3316 450-9263 T414546 for Excavator E320D2 Perkins Engine C7.1 DI

 

PLACE OF ORIGIN NEGOTIABLE WARRANTY 18 Months
MARKET TYPE 2022 DELIVERY TIME

Within one week after

receiving the payment

MOQ 1 PC PATMENT TERMS T/T, X-Transfer,L/C
QUALITY OUTSTANDING QUALITY PACKING

Wooden case/Carton/

Standard Shipping Package

 

BRAND EXCAVATOR MODEL NUMBER ENGINE MODEL NUMBER PART NUMBER CYLS
Perkins E320D2 C7.1 DI 425-3316 450-9263 T414546 6

 

 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 0

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 1

 

Principle Of Booster Piston Common Rail System (APCRS System):

 

The fuel enters the fuel rail after being pressurized, and then enters the fuel injector of each cylinder through the high pressure pipe. The fuel is divided into two paths in the fuel injector: one enters the booster piston The upper oil chamber enters the inside of the booster piston through the orifice, and then flows back to the fuel tank through the fuel injection pressure control valve PCV; The orifice enters the control oil chamber on the upper part of the control piston. Due to the pressurization effect of the booster piston, the pressure of the part of the fuel isolated by the one-way valve increases, so that the fuel injection pressure can reach more than 2000bar. Since the high-pressure part is located in the injector , so the reliability of the system is improved. The control of the injection pressure is realized by the injection pressure control valve PCV. By changing the control signal, the pressure difference between the upper and lower oil chambers of the booster piston can be controlled, so that the control effect is increasing. The pressure on the fuel in the oil chamber of the small head of the piston changes the injection oil pressure in the needle valve pressure chamber. The working principle of the fuel injection pressure control valve SCV is the same as that of the high-speed solenoid valve of the common rail system, that is, when When the SCV valve is powered off, the fuel injector does not inject fuel because the pressure on the upper part of the control piston generated by the fuel pressure is greater than the pressure on the pressure bearing surface of the needle valve; when the SCV is powered on, the oil chamber on the upper part of the control piston enters the The oil orifice is smaller than the oil outlet orifice, so the oil pressure in the oil chamber on the upper part of the control piston decreases, the pressure on the upper part of the control piston decreases rapidly, and the needle valve pressure chamber quickly opens and injects oil. By turning on the SCV several times, you can Realize multiple fuel injections. If combined with PCV, different shapes of main injection rate curves can be achieved.

 

 

 

 

COMPANY PROFILE:

 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 2

 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 3

 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 4

 

 

 

OUR ADVANTAGES:

 

·Original Factory Guarantee

 

·Higher Efficiency

 

·Lower Fuel Consumption

 

·Longer Life

 

·Genuine Parts

 

·OEM Replaceable Parts

 

·4000Hrs Warranty

 

·Compact Design

 

·Providing Optimum Dynamicity Of High Stability

 

·High-Precision Motivation Adjustment

 

·Easy Replacement In Customer System

 

·The Highest Level Of Durability In Extreme Conditions

 

·Reduce Wear And Prolong Life

 

·Longer Service Life

 

·Better - Resistant And Heat - Resistant

 

·High - Precision And High Stability

 

·OEM

 

·Professional Technical Team

 

·A Full Range Of One - Stop Resources

 

·The Most Trustworthy Quality

 

 

FACTORY STRENGTH:

 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 5

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 6

 

 

EXHIBITION
 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 7

 


 

PACKAGE&SHIPMENT

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 8

 

Perkins C7.1 DI 425-3316 450-9263 Engine Cylinder Block , T414546 Engine Cylinder Head Assembly 9

 

 

FAQ:

 

1. Are you manufacturer or trading company?

 

We are the OEM manufacturer, head Office is in HongKong China.

 

2. What products do you make?

 

We are engaged in manufacturing engine cylinder liner, piston, piston ring, cylinder liner kits, cylinder head gasket, engine gasket kits and Other core engine parts.

 

3. What scenario can your product be applied?

 

Our products are widely used in power fields such as construction machinery, generator set, commercial vehicle, passenger car. agricultural machinery, ship, etc.

 

4. Which countries and regions are your market extend all over?

 

Our markets includes North America, Western Europe and the Middle East, Southeast Asia, Africa South America and all over the world,for example:USA,Germany and Australia,UAE and Brazil and so on..

 

5. What is the standard of package?

 

We have Japanese TP Brand package, also have wooden case/carton/standard shipping package,Or custom-made packaging.

 

6. What is the delivery time?

 

Generally, we will arrange the goods within 24 hours after your payment; If some items are no stock, it will take 30-45 days to produce after received deposit.

 

7. What kind of payment terms do you have?

 

L/C, D/A, D/P, T/T, X-Transfer is also acceptable.

 

8.How can I get a quotation?

 

A complete quotation based on the details as follows in your inquiry:

a.Excavator brand name;

b.Excavator model number;

c. Engine model;

d.Part number;

e. Pictures;

f.Quantity;

g.Other requirements, such as Packing, Shipping and so on.

 

9.How do you pack the goods?

 

The products will be carefully handled by three steps:

a: Wrapped with packing paper or plastic bag;

b: Japanese TP brand box or customized box;

c: Put in an appropriate carton box or wooden boxes and be fixed firmly.

 

10.How can I know the status of my order?

 

We will keep you udpate the process of the preparation, to ensure all issues are resolved prior to the delivery.products pictures can be provided if required. We shall send out the goods immediately after confirmation and you will get the tracking information right away

 

11.How to guarantee your service?

 

· Strict inspection during production

· Strictly check the products before shipment to ensure our packaging in good condition

· Track and receive feedback from customer regularly

 

12.What will you do about quality complaint?

 

·We will respond to customer within 24 hours.

·Our QC will retest the same item in the warehouse, if confirmed it is quality problem, we will make corresponding compensation.

 

13.What is the warranty time of the products?

 

The warranty time is 18 months based on the item details; We don't provide warranty time for original and used products.